Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Three Amigos method illustration showing its working structure
Agile
Three Amigos
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Purposedifferent
When story, test, and implementation could drift apart, it brings business perspective, engineering, and quality together early. It prevents a story from being read differently only late in the process.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.
Complexitysame
LowLowLowLow
Timedifferent
15-30 min30 min Setup, dann laufend30-60 min20-40 min initial, dann laufend
Participantsdifferent
31-3 maintaining, briefing for everyone2-83-15
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop + async
Outputdifferent
Clarified Story, Test Examples, Open QuestionsRAID Log, Status Report SourcePower Interest Grid, Strategy per StakeholderROAM Board, Owner List
Tagsno overlap
CollaborationBehavior-Driven DevelopmentQualityRefinement
RiskTrackingStakeholdersGovernance
StakeholdersFacilitationAlignmentPlanning
RiskAgileTrackingAlignment
Add more methods