methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Three Amigos method illustration showing its working structure
Agile
Three Amigos
ChatOps workspace showing the question, observations, and next decision.
DevOps
ChatOps
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of Acceptance Criteria Workshop with a method-specific labelled workspace.
Agile
Acceptance Criteria Workshop
Purposedifferent
When story, test, and implementation could drift apart, it brings business perspective, engineering, and quality together early. It prevents a story from being read differently only late in the process.For operational work in a distributed team, the method links communication with direct system control. It records decisions right where the signal, the context, and the execution come together.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When a story needs clear checkpoints before implementation, it sharpens expectation and scope together. It sorts work by value, risk, and delivery ability. The result is captured as Acceptance Criteria and a Story Update.
Complexitydifferent
LowMediumLowLow
Timedifferent
15-30 minOngoing15-45 min20-40 min pro Story
Participantsdifferent
32-201-33-6
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncWorkshop
Outputdifferent
Clarified Story, Test Examples, Open QuestionsChat Transcript, Action Log, AutomationsADR File, Decision Log, RationaleAcceptance Criteria, Story Update
Tagsno overlap
CollaborationBehavior-Driven DevelopmentQualityRefinement
CollaborationEngineeringIncident
ArchitectureRationaleDocumentationGovernance
AgileRequirementsRefinementBehavior-Driven Development
Add more methods