methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Three Amigos method illustration showing its working structure
Agile
Three Amigos
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When story, test, and implementation could drift apart, it brings business perspective, engineering, and quality together early. It prevents a story from being read differently only late in the process.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowLowHigh
Timedifferent
15-30 min15-45 min30 min Setup, dann laufendSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
31-31-3 maintaining, briefing for everyoneEvaluation team, architects, and relevant stakeholders
Formatdifferent
Workshop + asyncAsyncAsyncWorkshop + async
Outputdifferent
Clarified Story, Test Examples, Open QuestionsADR File, Decision Log, RationaleRAID Log, Status Report SourcePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
CollaborationBehavior-Driven DevelopmentQualityRefinement
ArchitectureRationaleDocumentationGovernance
RiskTrackingStakeholdersGovernance
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods