View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Theory of Constraints | ![]() Facilitation Dot Estimation |
|---|---|---|
Purposedifferent | For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | High | Low |
Timedifferent | 2-4 h Analyse, laufend | 5-20 min |
Participantsdifferent | 3-12 | 3-20 |
Formatdifferent | Workshop + async | Workshop |
Outputdifferent | Constraint Map, Improvement Plan, Flow Metrics | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | OperationsConstraintsFlowImprovement | EstimationEffortRisk |
Often compared together
Methods with strong topical overlap with the current selection, not yet in the comparison.





