methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Purposedifferent
For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.
Complexitydifferent
HighLow
Timedifferent
2-4 h Analyse, laufend5-20 min
Participantsdifferent
3-123-20
Formatdifferent
Workshop + asyncWorkshop
Outputdifferent
Constraint Map, Improvement Plan, Flow MetricsEffort Heatmap, Risk Signals, Discussion Targets
Tagsno overlap
OperationsConstraintsFlowImprovement
EstimationEffortRisk
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis