View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Team Design Team Cognitive Load Assessment | ![]() Systems Thinking Rich Picture | ![]() Agile Sailboat Retrospective | ![]() Agile Starfish Retrospective |
|---|---|---|---|---|
Purposedifferent | When a team juggles too many domains, systems, or handoffs, it measures mental overload as an organizational problem. It clarifies responsibility, interaction, and load between teams. The result is captured as a cognitive-load profile and action list. | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture. | When improvement options need to be sorted more finely than just start and stop, it brings observations into clear kinds of action. This makes visible what should be done more, less, newly, or continued. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 60-90 min | 30-90 min | 45-90 min | 45-90 min |
Participantsdifferent | 3-12 | 2-10 | 4-12 | 4-12 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Cognitive Load Profile, Action List | Rich Picture, Problem Framing Notes | Sailboat Board, Risks, Improvement Actions | Starfish Board, Practice Changes, Experiments |
Tagsno overlap | TeamComplexityImprovementDiagnosis | Systems thinkingSoft systemsFramingVisualization | RetrospectiveTeamImprovement | RetrospectiveImprovementExperimentsTeam |



