View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Team Design Team Cognitive Load Assessment | ![]() Systems Thinking Rich Picture | ![]() Facilitation Responsibility Poker | ![]() Systems Thinking Soft Systems Methodology |
|---|---|---|---|---|
Purposedifferent | When a team juggles too many domains, systems, or handoffs, it measures mental overload as an organizational problem. It clarifies responsibility, interaction, and load between teams. The result is captured as a cognitive-load profile and action list. | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | When it stays unclear who carries responsibility and who only contributes, Responsibility Poker makes the distribution of responsibility explicit. It sharpens the boundaries between weighing in, deciding, and bearing consequences. | Soft Systems Methodology helps explore unclear or politically charged problems systematically. Instead of forcing a quick answer, the method builds a shared understanding of perspectives and room for action. |
Complexitydifferent | Medium | Low | Low | High |
Timedifferent | 60-90 min | 30-90 min | 45-90 min | 0.5-3 Tage |
Participantsdifferent | 3-12 | 2-10 | 3-10 | 5-15 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Cognitive Load Profile, Action List | Rich Picture, Problem Framing Notes | Responsibility Map, Role Agreements, Open Questions | Rich Picture, Root Definitions, Conceptual Models, Change Agenda |
Tagsno overlap | TeamComplexityImprovementDiagnosis | Systems thinkingSoft systemsFramingVisualization | RolesResponsibilityTeamFacilitation | Soft systemsComplexitySensemakingSystems thinking |



