View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Facilitation Team Charter | ![]() Systems Thinking Evaporating Cloud | ![]() Systems Thinking Future Reality Tree | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | When a team is starting fresh or working past each other, Team Charter clarifies the shared working basis. It visibly sets out how collaboration, decision paths, and mutual conduct should work day to day. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | Medium | Medium | High | High |
Timedifferent | 2-4 h | 60-120 min | 2-4 h | 1-5 Tage |
Participantsdifferent | 3-12 | 2-8 | 3-8 | 4-12 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Team Charter, Working Norms, Role Notes | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | TeamAlignmentCollaboration | Theory of ConstraintsAssumptionsSystems thinking | Theory of ConstraintsSystems thinkingChange | ChangeSystems thinkingCapability |



