methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Systems Mapping method illustration showing its working structure
Systems Thinking
Systems Mapping
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Ideal Days.
Agile
Ideal Days
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
Systems Mapping arranges elements, relationships, and boundaries so a complex field becomes legible at a glance. The overview stabilizes the overall picture before detail work or steering begins.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumMediumLowHigh
Timedifferent
1-3 h10-30 min je Item15-60 min2-4 h
Participantsdifferent
3-121-82-93-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
System Map, Dependencies, Leverage PointsThree-Point Estimate, Risk Range, Assumption NotesIdeal Day Estimates, Assumption Notes, Capacity CaveatsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
Systems thinkingMappingBoundariesChange
EstimationUncertaintyForecasting
EstimationEffortAgile
Theory of ConstraintsSystems thinkingChange
Add more methods