methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Surveys method illustration showing its working structure
UX Research
Surveys
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When a topic needs to be validated broadly and many people can answer the same question, surveys gather structured feedback in a scalable form. Answers become comparable and segmentable instead of remaining merely anecdotal.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
MediumHighLowHigh
Timedifferent
3-14 Tage1-4 Wochen60-90 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
50+1-64-12Evaluation team, architects, and relevant stakeholders
Formatdifferent
AsyncAsyncWorkshopWorkshop + async
Outputdifferent
Survey Results, Charts, Segment InsightsExperiment results, Decision log, Learning summaryAnnotated Diagram, Prioritized Risk List, Action BacklogPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
QuantitativeResearchValidation
ExperimentsGrowthAnalyticsValidation
RiskArchitectureWorkshopValidation
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods