methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Story Splitting method illustration showing its working structure
Agile
Story Splitting
Paper illustration for Bucket System.
Agile
Bucket System
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Planning Poker.
Agile
Planning Poker
Purposedifferent
When a story becomes too large for a clean flow, it breaks scope down along value and risk. It shapes the work into a form that ships earlier and is easier to verify.When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions.
Complexitydifferent
MediumMediumHighLow
Timedifferent
30-60 min30-90 min90-180 min2-5 min je Item
Participantsdifferent
2-63-123-83-9
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Smaller Stories, Acceptance Criteria, Split RationaleBucketed Backlog, Relative Estimates, Split CandidatesCoD Table, Prioritization SequenceRelative Estimates, Assumption Notes, Split Candidates
Tagsno overlap
BacklogIterationDelivery
EstimationBacklogRelative sizing
PrioritizationDeliveryEconomicsDecision
EstimationAgileRelative sizingTeam
Add more methods