View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Standard Work Analysis | ![]() Operations Waste Analysis | ![]() Operations DMAIC | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Medium | Low | High | Medium |
Timedifferent | 1-3 h | 45-120 min | 2-12 Wochen | 0.5-5 Tage |
Participantsdifferent | 2-6 | 2-8 | 3-10 | 4-10 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Waste Map, Prioritized Waste, Improvement Backlog | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | LeanProcessQuality | WasteLeanProcess improvement | Continuous improvementQualityProcess improvement | LeanContinuous improvementOperations |



