methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
MediumLowLowHigh
Timedifferent
1-3 h30-60 min20–45 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
2-63-10Small cross-functional groupEvaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Standard Work Sheet, Deviation List, Improved Standard, Training NeedsRisk Matrix, Top Risk ListRisk list, Mitigation plan, Assumption logPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
LeanProcessQuality
RiskDecisionPrioritizationAssessment
RiskDecisionFailurePlanning
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods