View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
MediumLowLowLow
Timedifferent
1-3 h20–45 min30-60 min30-90 min
Participantsdifferent
2-6Small cross-functional group3-102-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Standard Work Sheet, Deviation List, Improved Standard, Training NeedsRisk list, Mitigation plan, Assumption logRisk Matrix, Top Risk ListConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
LeanProcessQuality
RiskDecisionFailurePlanning
RiskDecisionPrioritizationAssessment
ConstraintsDecisionPlanningOptions