methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
MediumLowLowHigh
Timedifferent
1-3 h20–45 min45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
2-6Small cross-functional group2-8Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Standard Work Sheet, Deviation List, Improved Standard, Training NeedsRisk list, Mitigation plan, Assumption logAssumption List, Critical Assumptions, Learning PlanPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
LeanProcessQuality
RiskDecisionFailurePlanning
AssumptionsRiskDecisionDiscovery
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods