View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Standard Work Analysis | ![]() Operations DMAIC | ![]() Delivery Value Stream Mapping | ![]() Operations Kaizen Event |
|---|---|---|---|---|
Purposedifferent | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. |
Complexitydifferent | Medium | High | Medium | Medium |
Timedifferent | 1-3 h | 2-12 Wochen | 1-3 h | 0.5-5 Tage |
Participantsdifferent | 2-6 | 3-10 | 4-10 | 4-10 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Current-state map, Future-state map, Bottleneck list | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update |
Tagsno overlap | LeanProcessQuality | Continuous improvementQualityProcess improvement | LeanFlowWasteDelivery | LeanContinuous improvementOperations |



