View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Standard Work Analysis | ![]() Operations DMAIC | ![]() Product Discovery Assumption Mapping | ![]() Product Discovery Riskiest Assumption Test |
|---|---|---|---|---|
Purposedifferent | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. |
Complexitydifferent | Medium | High | Medium | Medium |
Timedifferent | 1-3 h | 2-12 Wochen | 45-60 min | 1-2 Wochen pro Iteration |
Participantsdifferent | 2-6 | 3-10 | 2-8 | 2-6 |
Formatdifferent | Workshop | Workshop + async | Workshop + async | Workshop + async |
Outputdifferent | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Assumption map, Test backlog, Risk ranking | Prioritized Assumption List, Test Plan, Results Report |
Tagsno overlap | LeanProcessQuality | Continuous improvementQualityProcess improvement | AssumptionsRiskExperimentsValidation | ExperimentsValidationDiscoveryAssumptions |



