methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumHighHighLow
Timedifferent
1-3 h90-180 min2-8 h15-30 min
Participantsdifferent
2-63-82-82-6
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Standard Work Sheet, Deviation List, Improved Standard, Training NeedsCoD Table, Prioritization SequenceProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures
Tagsno overlap
LeanProcessQuality
PrioritizationDeliveryEconomicsDecision
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
Add more methods