methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
MediumLowHighHigh
Timedifferent
1-3 h15-30 minSeveral meetings plus preparation and analysis; total effort depends on scope2-6 h
Participantsdifferent
2-62-6Evaluation team, architects, and relevant stakeholders3-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Standard Work Sheet, Deviation List, Improved Standard, Training NeedsRoot cause notes, CountermeasuresPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
LeanProcessQuality
Root causeIncidentLeanProblem solving
ArchitectureQualityRiskTradeoffsStakeholders
RiskQualityOperationsRoot cause
Add more methods