methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Stakeholder Salience Model with its method-specific working model.
Facilitation
Stakeholder Salience Model
Paper illustration of Goal Question Metric with its method-specific working model.
Engineering
Goal Question Metric
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.When stakeholders appear to matter very differently, the Stakeholder Salience Model rates their actual priority through power, legitimacy, and urgency. It turns individual contributions into a visible selection. The result is captured as a Salience diagram and a class-based strategy.Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
LowMediumMediumMedium
Timedifferent
60–90 min60-90 min90-180 min1-2 h
Participantsdifferent
2-83-63-64-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Stakeholder Map, Engagement Plan, Risk NotesSalience Diagram, Strategy per ClassGQM Table, Metric ProfilesAlignment Map, Open Issues, Decision Questions
Tags1 shared
StakeholdersAlignmentFacilitationChange
StakeholdersFacilitationAlignmentGovernance
MetricsMeasurementEngineeringAlignment
AlignmentStakeholdersStrategyFacilitation
Add more methods