methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Systems Mapping method illustration showing its working structure
Systems Thinking
Systems Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.Systems Mapping arranges elements, relationships, and boundaries so a complex field becomes legible at a glance. The overview stabilizes the overall picture before detail work or steering begins.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
LowHighMediumLow
Timedifferent
60–90 min2-4 h1-3 h30-60 min
Participantsdifferent
2-83-83-122-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Stakeholder Map, Engagement Plan, Risk NotesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsSystem Map, Dependencies, Leverage PointsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
StakeholdersAlignmentFacilitationChange
Theory of ConstraintsSystems thinkingChange
Systems thinkingMappingBoundariesChange
StakeholdersFacilitationAlignmentPlanning
Add more methods