methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Spotify Model Mapping with its method-specific working model.
Team Design
Spotify Model Mapping
Funnel Analysis workspace showing the question, observations, and next decision.
Growth
Funnel Analysis
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When a team landscape has grown without clear grouping, it maps roles and relationships onto the Spotify model. It clarifies responsibility, interaction, and load between teams. The result is captured as a Spotify model map and action list.When many visitors or users drop off along the way, the reason behind the number often stays hidden. Funnel Analysis exposes these transitions and makes visible exactly where the path collapses.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
90-180 min1-3 h1-2 h30-60 min
Participantsdifferent
5-151-54-122-8
Formatdifferent
WorkshopAsyncWorkshopWorkshop
Outputdifferent
Spotify Model Map, Action ListFunnel report, Drop-off analysis, Optimization hypothesesAlignment Map, Open Issues, Decision QuestionsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
TeamOrganizationAlignmentDiagnosis
AnalyticsConversionGrowth
AlignmentStakeholdersStrategyFacilitation
StakeholdersFacilitationAlignmentPlanning
Add more methods