methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Scrum with its method-specific working model.
Agile
Scrum
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Purposedifferent
When a team needs to work in a fixed delivery rhythm, it stabilizes cadence, responsibility, and feedback loops. It makes collaboration reliable across sprint boundaries.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.
Complexitydifferent
MediumMediumLowLow
Timedifferent
1-4 Wochen je Sprint, laufend1-3 Tage30 min Setup, dann laufend15-45 min
Participantsdifferent
3-10 (Scrum Team)1-41-3 maintaining, briefing for everyone1-3
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncAsync
Outputdifferent
Product Backlog, Sprint Backlog, Increment, Sprint GoalArchitecture Views, Cross-view Notes, RationaleRAID Log, Status Report SourceADR File, Decision Log, Rationale
Tagsno overlap
AgileIterationCadence
DocumentationStakeholdersArchitecture
RiskTrackingStakeholdersGovernance
ArchitectureRationaleDocumentationGovernance
Add more methods