methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Scrum with its method-specific working model.
Agile
Scrum
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
When a team needs to work in a fixed delivery rhythm, it stabilizes cadence, responsibility, and feedback loops. It makes collaboration reliable across sprint boundaries.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
1-4 Wochen je Sprint, laufend1-5 Tage60-120 minHalf day
Participantsdifferent
3-10 (Scrum Team)4-122-83-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Product Backlog, Sprint Backlog, Increment, Sprint GoalLogic Model, Change Objectives, Intervention Components, Evaluation PlanConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsLeverage Map, Action Strategy
Tagsno overlap
AgileIterationCadence
ChangeSystems thinkingCapability
Theory of ConstraintsAssumptionsSystems thinking
Systems thinkingChangeStrategy
Add more methods