methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Scrum with its method-specific working model.
Agile
Scrum
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Purposedifferent
When a team needs to work in a fixed delivery rhythm, it stabilizes cadence, responsibility, and feedback loops. It makes collaboration reliable across sprint boundaries.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.
Complexitydifferent
MediumHighLowMedium
Timedifferent
1-4 Wochen je Sprint, laufend2-4 h30-60 min60-120 min
Participantsdifferent
3-10 (Scrum Team)3-82-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Product Backlog, Sprint Backlog, Increment, Sprint GoalFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsIceberg Worksheet, Pattern Notes, Intervention IdeasConflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments
Tagsno overlap
AgileIterationCadence
Theory of ConstraintsSystems thinkingChange
Systems thinkingRoot causePatterns
Theory of ConstraintsAssumptionsSystems thinking
Add more methods