methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Scrum with its method-specific working model.
Agile
Scrum
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
When a team needs to work in a fixed delivery rhythm, it stabilizes cadence, responsibility, and feedback loops. It makes collaboration reliable across sprint boundaries.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
MediumHighLowHigh
Timedifferent
1-4 Wochen je Sprint, laufend2-4 h30-60 min2-6 h
Participantsdifferent
3-10 (Scrum Team)3-82-103-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Product Backlog, Sprint Backlog, Increment, Sprint GoalFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsIceberg Worksheet, Pattern Notes, Intervention IdeasCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
AgileIterationCadence
Theory of ConstraintsSystems thinkingChange
Systems thinkingRoot causePatterns
Systems thinkingRoot causeConstraintsCausality
Add more methods