methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Scenario Planning method illustration showing its working structure
Business Strategy
Scenario Planning
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
Scenario Planning opens the view to several plausible futures instead of a single forecast. The method protects strategies from depending on too narrow an expected path.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
HighHighMediumHigh
Timedifferent
0.5-2 TageHalf day45-120 min2-6 h
Participantsdifferent
4-123-122-63-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Scenario Set, Strategic Implications, Robust OptionsLeverage Map, Action StrategyChange Matrix, Cause Hypotheses, Validation Questions, Action ListCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
StrategyUncertaintyPlanning
Systems thinkingChangeStrategy
ChangeRoot causeTroubleshootingComparison
Systems thinkingRoot causeConstraintsCausality
Add more methods