View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Scatter Diagram | ![]() Operations Getting Things Done | ![]() Operations ALPEN Method | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Low | Medium | Low | High |
Timedifferent | 30-90 min | 1-2 h Setup, laufend | 10-20 min daily | 2-6 h |
Participantsdifferent | 1-4 | 1 | 1 | 3-10 |
Formatdifferent | Workshop + async | Async | Async | Workshop |
Outputdifferent | Scatter Plot, Korrelationsnotiz, Hypothesenliste | Action Lists, Project List, Review Routine | Daily Plan, Time Estimates, Review Notes | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | Root causeQualityVisualization | ProductivityPlanningTasksExecution | PlanningTime managementProductivityOperations | RiskQualityOperationsRoot cause |



