View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Scatter Diagram | ![]() Operations ALPEN Method | ![]() Operations 5 Whys | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | When the question is whether two measures are related, the method makes patterns in the data picture visible. It separates felt correlations from relationships that actually show up in the data. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Low | Low | Low | High |
Timedifferent | 30-90 min | 10-20 min daily | 15-30 min | 2-6 h |
Participantsdifferent | 1-4 | 1 | 2-6 | 3-10 |
Formatdifferent | Workshop + async | Async | Workshop | Workshop |
Outputdifferent | Scatter Plot, Korrelationsnotiz, Hypothesenliste | Daily Plan, Time Estimates, Review Notes | Root cause notes, Countermeasures | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | Root causeQualityVisualization | PlanningTime managementProductivityOperations | Root causeIncidentLeanProblem solving | RiskQualityOperationsRoot cause |



