methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Sailboat Retrospective
Agile
Sailboat Retrospective
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration of a team retrospective with three separate Start, Stop, and Continue areas and a shared action list.
Agile
Start Stop Continue
Purposedifferent
When a team wants to read momentum, brakes, and risks together, it offers an easily understandable picture of the situation. It makes drive, obstacles, and headwind visible in the same picture.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood.
Complexitydifferent
LowHighMediumLow
Timedifferent
45-90 min1-4 Wochen45-60 min30-60 min
Participantsdifferent
4-121-62-83-12
Formatdifferent
WorkshopAsyncWorkshop + asyncWorkshop
Outputdifferent
Sailboat Board, Risks, Improvement ActionsExperiment results, Decision log, Learning summaryAssumption map, Test backlog, Risk rankingStart Stop Continue Board, Improvement Actions
Tagsno overlap
RetrospectiveTeamImprovement
ExperimentsGrowthAnalyticsValidation
AssumptionsRiskExperimentsValidation
RetrospectiveImprovementTeamReflection
Add more methods