methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Purposedifferent
When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.
Complexitydifferent
LowLowMediumLow
Timedifferent
20-40 min initial, dann laufend20–45 min45-60 min30-90 min
Participantsdifferent
3-15Small cross-functional group2-82-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
ROAM Board, Owner ListRisk list, Mitigation plan, Assumption logAssumption map, Test backlog, Risk rankingConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries
Tagsno overlap
RiskAgileTrackingAlignment
RiskDecisionFailurePlanning
AssumptionsRiskExperimentsValidation
ConstraintsDecisionPlanningOptions
Add more methods