View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile ROAM Board | ![]() Facilitation Power Interest Grid | ![]() Growth A/B Testing | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Low | High | Medium |
Timedifferent | 20-40 min initial, dann laufend | 30-60 min | 1-4 Wochen | 45-60 min |
Participantsdifferent | 3-15 | 2-8 | 1-6 | 2-8 |
Formatdifferent | Workshop + async | Workshop | Async | Workshop + async |
Outputdifferent | ROAM Board, Owner List | Power Interest Grid, Strategy per Stakeholder | Experiment results, Decision log, Learning summary | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | RiskAgileTrackingAlignment | StakeholdersFacilitationAlignmentPlanning | ExperimentsGrowthAnalyticsValidation | AssumptionsRiskExperimentsValidation |



