methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitydifferent
LowMediumHighLow
Timedifferent
20-40 min initial, dann laufend45-60 minSeveral meetings plus preparation and analysis; total effort depends on scope30 min Setup, dann laufend
Participantsdifferent
3-152-8Evaluation team, architects, and relevant stakeholders1-3 maintaining, briefing for everyone
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncAsync
Outputdifferent
ROAM Board, Owner ListAssumption map, Test backlog, Risk rankingPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRAID Log, Status Report Source
Tags1 shared
RiskAgileTrackingAlignment
AssumptionsRiskExperimentsValidation
ArchitectureQualityRiskTradeoffsStakeholders
RiskTrackingStakeholdersGovernance
Add more methods