Criterion
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Paper illustration of Acceptance Criteria Workshop with a method-specific labelled workspace.
Agile
Acceptance Criteria Workshop
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Three Amigos method illustration showing its working structure
Agile
Three Amigos
Purposedifferent
When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.When a story needs clear checkpoints before implementation, it sharpens expectation and scope together. It sorts work by value, risk, and delivery ability. The result is captured as Acceptance Criteria and a Story Update.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.When story, test, and implementation could drift apart, it brings business perspective, engineering, and quality together early. It prevents a story from being read differently only late in the process.
Complexitydifferent
LowLowHighLow
Timedifferent
20-40 min initial, dann laufend20-40 min pro Story2-6 h15-30 min
Participantsdifferent
3-153-63-103
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
ROAM Board, Owner ListAcceptance Criteria, Story UpdateFMEA Table, Risk Priority, Mitigation ActionsClarified Story, Test Examples, Open Questions
Tagsno overlap
RiskAgileTrackingAlignment
AgileRequirementsRefinementBehavior-Driven Development
RiskQualityOperationsRoot cause
CollaborationBehavior-Driven DevelopmentQualityRefinement