View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile ROAM Board | ![]() Operations ABC Analysis | ![]() Operations Kaizen Event | ![]() Operations Failure Mode and Effects Analysis |
|---|---|---|---|---|
Purposedifferent | When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List. | With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention. | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. |
Complexitydifferent | Low | Low | Medium | High |
Timedifferent | 20-40 min initial, dann laufend | 30-60 min | 0.5-5 Tage | 2-6 h |
Participantsdifferent | 3-15 | 1-5 | 4-10 | 3-10 |
Formatdifferent | Workshop + async | Async | Workshop | Workshop |
Outputdifferent | ROAM Board, Owner List | ABC Classification, Focus Rules, Control List | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | FMEA Table, Risk Priority, Mitigation Actions |
Tagsno overlap | RiskAgileTrackingAlignment | PrioritizationOperationsPortfolio | LeanContinuous improvementOperations | RiskQualityOperationsRoot cause |



