methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for Time Blocking
Operations
Time Blocking
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitysame
LowLowLowLow
Timedifferent
60-90 min15-30 min Planung, laufend20–45 min45-90 min
Participantsdifferent
4-121Small cross-functional group2-8
Formatdifferent
WorkshopAsyncWorkshopWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogBlocked Calendar, Capacity View, Focus PlanRisk list, Mitigation plan, Assumption logAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
RiskArchitectureWorkshopValidation
PlanningTime managementFocus
RiskDecisionFailurePlanning
AssumptionsRiskDecisionDiscovery
Add more methods