methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for Time Blocking
Operations
Time Blocking
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Paper illustration for ALPEN Method
Operations
ALPEN Method
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time.
Complexitydifferent
LowLowMediumLow
Timedifferent
60-90 min15-30 min Planung, laufend2–4 h review as a planning range; preparation and evaluation additional10-20 min daily
Participantsdifferent
4-121Designers, developers as users, and facilitation1
Formatdifferent
WorkshopAsyncWorkshop + asyncAsync
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogBlocked Calendar, Capacity View, Focus PlanPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsDaily Plan, Time Estimates, Review Notes
Tagsno overlap
RiskArchitectureWorkshopValidation
PlanningTime managementFocus
ArchitectureEngineeringFeedbackValidationTasks
PlanningTime managementProductivityOperations
Add more methods