methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Surveys method illustration showing its working structure
UX Research
Surveys
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When a topic needs to be validated broadly and many people can answer the same question, surveys gather structured feedback in a scalable form. Answers become comparable and segmentable instead of remaining merely anecdotal.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowMediumHighHigh
Timedifferent
60-90 min3-14 Tage2-6 hSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
4-1250+3-10Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopAsyncWorkshopWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogSurvey Results, Charts, Segment InsightsFMEA Table, Risk Priority, Mitigation ActionsPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
RiskArchitectureWorkshopValidation
QuantitativeResearchValidation
RiskQualityOperationsRoot cause
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods