View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Risk Storming | ![]() Agile Start Stop Continue | ![]() Agile Mad Sad Glad | ![]() Architecture ARID (Active Reviews for Intermediate Designs) |
|---|---|---|---|---|
Purposedifferent | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When a team wants to deliberately adjust its working behavior, it makes habits visible and assessable. It focuses on concrete changes instead of diffuse mood. | When a team's or workshop's mood needs to become readable, it structures emotional signals with little setup. It makes strain, relief, and sources of energy tangible. | ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification. |
Complexitydifferent | Low | Low | Low | Medium |
Timedifferent | 60-90 min | 30-60 min | 30-60 min | 2–4 h review as a planning range; preparation and evaluation additional |
Participantsdifferent | 4-12 | 3-12 | 3-10 | Designers, developers as users, and facilitation |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Annotated Diagram, Prioritized Risk List, Action Backlog | Start Stop Continue Board, Improvement Actions | Emotion Board, Themes, Action Items | Prioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions |
Tagsno overlap | RiskArchitectureWorkshopValidation | RetrospectiveImprovementTeamReflection | RetrospectiveTeamReflection | ArchitectureEngineeringFeedbackValidationTasks |



