methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for Standard Work Analysis.
Operations
Standard Work Analysis
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowMediumMediumHigh
Timedifferent
60-90 min1-3 h45-60 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
4-122-62-8Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogStandard Work Sheet, Deviation List, Improved Standard, Training NeedsAssumption map, Test backlog, Risk rankingPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
RiskArchitectureWorkshopValidation
LeanProcessQuality
AssumptionsRiskExperimentsValidation
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods