methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper board with the four ROAM fields Resolved, Owned, Accepted, and Mitigated.
Agile
ROAM Board
Quality Attribute Workshop workspace showing the question, observations, and next decision.
Architecture
Quality Attribute Workshop
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When work needs to move between different states or columns, it makes that movement and its handoffs legible. It sorts work by value, risk, and delivery ability. The result is captured as a ROAM Board and an Owner List.A Quality Attribute Workshop translates quality requirements into concrete scenarios and architecture impulses. The method brings product, engineering, and operations to the same view of desired properties.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
LowLowMediumMedium
Timedifferent
60-90 min20-40 min initial, dann laufend2-4 h45-60 min
Participantsdifferent
4-123-155-152-8
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogROAM Board, Owner ListQuality Scenarios, Priority List, Architecture ConcernsAssumption map, Test backlog, Risk ranking
Tagsno overlap
RiskArchitectureWorkshopValidation
RiskAgileTrackingAlignment
RequirementsArchitectureWorkshop
AssumptionsRiskExperimentsValidation
Add more methods