methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of the Consensus Workshop working structure.
Facilitation
Consensus Workshop
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When a group needs a solid decision without outvoting individual factions, a Consensus Workshop creates a negotiable common ground. It makes agreement, reservations, and open tensions discussable at the same time.
Complexitydifferent
LowLowLowMedium
Timedifferent
60-90 min30 min Setup, dann laufend30-60 min1-3 h
Participantsdifferent
4-121-3 maintaining, briefing for everyone2-85-30
Formatdifferent
WorkshopAsyncWorkshopWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogRAID Log, Status Report SourcePower Interest Grid, Strategy per StakeholderConsensus Clusters, Theme Titles, Priority Areas
Tagsno overlap
RiskArchitectureWorkshopValidation
RiskTrackingStakeholdersGovernance
StakeholdersFacilitationAlignmentPlanning
FacilitationConsensusWorkshopAlignment
Add more methods