methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Weekly Review.
Operations
Weekly Review
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.In a week with many open loops, the method creates distance from operational noise. It organizes commitments, calendar, and projects so the next week becomes workable.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.
Complexitydifferent
LowLowLowMedium
Timedifferent
60-90 min20–45 min30-60 min2–4 h review as a planning range; preparation and evaluation additional
Participantsdifferent
4-12Small cross-functional group1Designers, developers as users, and facilitation
Formatdifferent
WorkshopWorkshopAsyncWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogRisk list, Mitigation plan, Assumption logUpdated Task System, Weekly Focus, Next ActionsPrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisions
Tagsno overlap
RiskArchitectureWorkshopValidation
RiskDecisionFailurePlanning
ProductivityExecutionPlanning
ArchitectureEngineeringFeedbackValidationTasks
Add more methods