methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitysame
LowLowLowLow
Timedifferent
60-90 min20–45 min30-90 min60-90 min
Participantsdifferent
4-12Small cross-functional group2-84-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogRisk list, Mitigation plan, Assumption logConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
RiskArchitectureWorkshopValidation
RiskDecisionFailurePlanning
ConstraintsDecisionPlanningOptions
FacilitationDecisionProblem solvingWorkshop
Add more methods