methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
LowHighHighLow
Timedifferent
60-90 min2-8 hSeveral meetings plus preparation and analysis; total effort depends on scope60-90 min
Participantsdifferent
4-122-8Evaluation team, architects, and relevant stakeholders4-10
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogProblem Analysis, Decision Analysis, Risk PlanPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
RiskArchitectureWorkshopValidation
Problem solvingRoot causeDecisionOperations
ArchitectureQualityRiskTradeoffsStakeholders
FacilitationDecisionProblem solvingWorkshop
Add more methods