View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Risk Storming | ![]() Systems Thinking Intervention Mapping | ![]() Systems Thinking Evaporating Cloud | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Low | High | Medium | High |
Timedifferent | 60-90 min | 1-5 Tage | 60-120 min | 2-4 h |
Participantsdifferent | 4-12 | 4-12 | 2-8 | 3-8 |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Annotated Diagram, Prioritized Risk List, Action Backlog | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Conflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | RiskArchitectureWorkshopValidation | ChangeSystems thinkingCapability | Theory of ConstraintsAssumptionsSystems thinking | Theory of ConstraintsSystems thinkingChange |



