methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowHighLowHigh
Timedifferent
60-90 min2-6 h60-90 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
4-123-104-10Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshopWorkshopWorkshop + async
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogFMEA Table, Risk Priority, Mitigation ActionsProblem Cluster, Prioritized Challenge, ExperimentPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
RiskArchitectureWorkshopValidation
RiskQualityOperationsRoot cause
FacilitationDecisionProblem solvingWorkshop
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods