View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Risk Storming | ![]() Innovation Design Sprint | ![]() Product Discovery Riskiest Assumption Test | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | High | Medium | Low |
Timedifferent | 60-90 min | 4-5 Tage | 1-2 Wochen pro Iteration | 45-90 min |
Participantsdifferent | 4-12 | 5-8 | 2-6 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Annotated Diagram, Prioritized Risk List, Action Backlog | Prototype, Test Findings, Decision Rationale | Prioritized Assumption List, Test Plan, Results Report | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskArchitectureWorkshopValidation | Design sprintPrototypeValidationInnovation | ExperimentsValidationDiscoveryAssumptions | AssumptionsRiskDecisionDiscovery |