methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
A paper-based illustration representing Design Sprint with its core stages and visible working result.
Innovation
Design Sprint
Design sheets and interface cards connect to jointly written pseudocode with highlighted unresolved questions.
Architecture
ARID (Active Reviews for Intermediate Designs)
Design Thinking as a learning loop: an observation notebook, a focused problem statement, different idea sketches, a cardboard prototype and user-test notes. Feedback leads to new understanding.
Innovation
Design Thinking
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When the product question is unclear and time pressure is high, the method takes a team from an open idea to a testable solution. It connects problem understanding, decision, and learning in one compact format, lowering the risk of spending a lot of energy on a mere guess.ARID examines how well developers can work with a technical design. It focuses on a part of the system that can still be revised, between the architecture overview and the detailed specification.For complex user problems with an uncertain cause, the method connects observation, interpretation, and experiment into a learning cycle. It keeps the focus on real needs and avoids premature solution language. This produces robust decisions for product and service.
Complexitydifferent
LowHighMediumHigh
Timedifferent
60-90 min4-5 Tage2–4 h review as a planning range; preparation and evaluation additional1 Tag bis mehrere Wochen
Participantsdifferent
4-125-8Designers, developers as users, and facilitation4-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogPrototype, Test Findings, Decision RationalePrioritized development tasks, Jointly produced code or pseudocode, Observed difficulties and open design questions, Proposed design revisionsProblem Statement, Prototype, Test Learnings
Tagsno overlap
RiskArchitectureWorkshopValidation
Design sprintPrototypeValidationInnovation
ArchitectureEngineeringFeedbackValidationTasks
InnovationPrototypeResearch
Add more methods