View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Architecture Risk Storming | ![]() Facilitation Decision Jam | ![]() Product Discovery Riskiest Assumption Test | ![]() Product Discovery Assumption Mapping |
|---|---|---|---|---|
Purposedifferent | Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog. | When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer. | When an idea hinges on one critical unknown, it prioritizes testing that exact piece of uncertainty first. It separates problem, assumption, solution, and evidence. The result is captured as a prioritized list of assumptions, a test plan, and a result report. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. |
Complexitydifferent | Low | Low | Medium | Medium |
Timedifferent | 60-90 min | 60-90 min | 1-2 Wochen pro Iteration | 45-60 min |
Participantsdifferent | 4-12 | 4-10 | 2-6 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Annotated Diagram, Prioritized Risk List, Action Backlog | Problem Cluster, Prioritized Challenge, Experiment | Prioritized Assumption List, Test Plan, Results Report | Assumption map, Test backlog, Risk ranking |
Tagsno overlap | RiskArchitectureWorkshopValidation | FacilitationDecisionProblem solvingWorkshop | ExperimentsValidationDiscoveryAssumptions | AssumptionsRiskExperimentsValidation |



