methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitysame
LowLowLowLow
Timedifferent
60-90 min60-90 min30-90 min20–45 min
Participantsdifferent
4-124-102-8Small cross-functional group
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Annotated Diagram, Prioritized Risk List, Action BacklogProblem Cluster, Prioritized Challenge, ExperimentConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesRisk list, Mitigation plan, Assumption log
Tagsno overlap
RiskArchitectureWorkshopValidation
FacilitationDecisionProblem solvingWorkshop
ConstraintsDecisionPlanningOptions
RiskDecisionFailurePlanning
Add more methods